Drone Looking North – Aerial Overview of Phase II Construction and the Municipal Complex. Background Left: New DPW Building / Background Right: Water Dept.  Foreground Left: Detention Area,Tower 2, Elevator in PD Building A Area / Foreground Right: Structural Steel Erection in FD Building B Area

Drone Looking South

EARLY MAY

Concrete Pour for Building B Walls

Building B Area Foundation Walls

Early Stages of Masonry Work in the PD Building A Cell Block Detention Area

Cell Block Progressing

Detention Area Exterior CMU

Contractor Building Invert for Connection to Sewer Main

CMU Work Tower No. 2 Building A Area

Carport Concrete Footings

Structural Steel Erected for Carport

Steel Being Erected for the Storage Building

Roof Panels Installed on Storage Building

MID MAY

Storage Building Wall Panel Installation

Storage Building Exterior Complete – Rear View

Front View

Mast Platform Utilized by Masons Working on Tower No. 2 Building  A Area

Exterior CMU Nearly Complete for Tower #2

Elevator Exterior CMU Work Nearly Complete

Detention Area Metal Door Frames Installed

 

Structural Steel for Buildings A and B Begins to Arrive Onsite

Concrete Walls Formed in Building B Area

Structural Steel Erection Begins with Columns at FD Building B Area

Steel Erection Progresses in Building B Area

Steel Being Erected in Building A Area

LATE MAY

Building A Steel Erection and Masonry Progress

Overview of Building A Area

View from Under the Steel Construction Building A Area

Apparatus Bay Overhead Door Frames Installed in FD Building B Area

Water and Fire Service Brought Into the Site