Overview of Building A Sheathing Installation from West Parking Lot Looking East

View of the North Side of Building A Area 2nd Floor

Building A Prepped for Vapor Barrier

Interior View of the Apparatus Bay Steel Roof Trusses – Looking South Toward Rte. 106

Contractors Work on Roof Membrane Installation at the Carport

Drainage Pipe Installation on Route 106

Contractor Working in the Manhole!

Flowable Fill Poured into Trench to Reduce Settlement

FD Living Quarters HVAC Installation Begins

MID TO LATE AUGUST

Plumbing, HVAC Roughs and Interior Masonry in Progress at the FD Living Quarters

Overview of Plumbing, HVAC Roughs in FD Living Quarters

Building A Area Concrete Poured and Finished

Building A Detention Area Vapor Barrier Installed – Prepped for Concrete Slab

Stairway #2 Welded and Installed – Building A

Metal Framing Under Way on the 2nd Floor Building A Area, Door Frames Installed

Roof Blocking at the Apparatus Bay

Roof Membrane Installed on the Carport

Looking East Overview of Building A Area from the Parking Lot

Looking West – Overview of the South Side of the Building and Apparatus Bay

Overview of the North Side of Building A

Looking East – Overview of the South Side of Building A

Contractor Eager to Get to Work !